Asset Report
Bestobe gold mine
Report summary
Bestobe transitioned from an open pit and underground operation to solely an underground operation in 2019. The processing plant comprises a gravity, flotation and CIP circuit. In February 2013, Polyus sold its Kazakhstan operations (Aksu, Bestobe and Zholymbet) and the Akzhal deposit to a consortium consisting of Institute Project B.V., Financial Services B.V. and Folkstand Consortium Limited. Due to limited information, the accompanying analysis is based on Wood Mackenzie assumptions.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,250
Asset Report
Zholymbet gold mine
A detailed analysis of the Zholymbet gold mine.
$2,250
Asset Report
Sipan (Closed) gold mine
A detailed analysis of the Sipan (Closed) gold mine.
$2,250