Asset Report
Binanipuram zinc smelter
Report summary
Cominco Binani Zinc was founded in 1964 as a joint venture between the Binani family and Cominco of Canada. The initial capacity of the smelter was 14kt/a and it was built largely to Cominco design, with a Cominco flash roaster, neutral leaching only, and a tankhouse with manual stripping. Commissioning was in 1967, the smelter producing the first electrolytic slab zinc in India. The site in Kerala was chosen for its access to port facilities (the smelter has always used imported...
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Binani Rajasthan zinc smelter project
A detailed analysis of the Binani Rajasthan zinc smelter project.
$2,250
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,250