Asset Report
Biron (Closed) gold mine
Report summary
Bank cubic metre amounts have been converted to tonnes assuming a specific gravity of 1.8t/m3. According to arrangements with Ecuadorian government, gold must be sold by the company to the government at a 2% discount to the London gold price.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Laverton (Closed) gold mine
A detailed analysis of the Laverton (Closed) gold mine.
$2,250
Asset Report
Two Boys (Closed) gold mine
A detailed analysis of the Two Boys (Closed) gold mine.
$2,250
Asset Report
Kalgoorlie - Mt. Percy (Closed) gold mine
A detailed analysis of the Kalgoorlie - Mt. Percy (Closed) gold mine.
$2,250