Asset Report

Boddington Expansion gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

14 June 2019

Boddington Expansion gold mine

Report summary

Boddington started in August 2009 as essentially a gold mine with significant copper by-product. The mine operates the north and the south deposits as conventional open pits. The South pit provides 70% of the ore feed and the balance is from the North pit. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Boddington Expansion gold mine

    XLS 130.50 KB

  • Document

    Boddington Expansion gold mine

    PDF 1.09 MB

  • Document

    Boddington Expansion gold mine

    ZIP 1.06 MB

Trusted by leading organisations