Asset Report
Boddington Expansion gold mine
Report summary
Boddington is located 130 kilometres south-east of Perth, Western Australia, and originally operated from 1987 to 2001 as a large open-pit mine exploiting a gold oxide resource. The current Boddington Expansion project commenced in 2009 and produces both gold and copper. Conventional open-pit mining is carried out, with the South pit providing 70% of the ore feed and the balance from the North pit. Boddington operates a 40Mt/a ore processing plant that includes both a flotation circuit that produces a low grade copper concentrate, and a carbon in leach plant to process the tailings of the flotation circuit to a dore.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Process
- CAPEX
Tables and charts
This report includes 2 images and tables including:
- Boddington Expansion Emission Intensity Quartile ranking – total global production - tonnes Au equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Boddington Expansion copper mine
A detailed analysis of the Boddington Expansion copper mine.
$2,250
Asset Report
Sipan (Closed) gold mine
A detailed analysis of the Sipan (Closed) gold mine.
$2,250
Asset Report
Kainantu Restart gold mine
A detailed analysis of Kainantu Restart gold mine.
$2,250