Asset report

Centauro - La Herradura gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

La Herradura is composed by an open pit mine heap leach and a Merrill Crowe processing. The extension of the Centauro pit (previously Mega Centauro) is considered the natural evolution of the mine. During 2015 the company progressed in the development of the optimal pit design which is being evaluated. This US$155 million project is expected to commence production in 2019. The underground project called Centauro Deep is expected to be in operation by 2020 at a remaining capital cost of US$200 million (as of end 2015) and is expected to produce an annual average of 225 kilo ounces of gold. The accompanying analysis includes production from both the open pit and the proposed underground operation.

What's included

This report contains

  • Document

    Centauro - La Herradura gold mine

    PDF 632.18 KB

  • Document

    Centauro - La Herradura gold mine

    XLS 130.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898