Asset report

Cerro Bayo (Fachinal) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The operation is comprised of an underground mine and a concentrator with a 1.65kt/d nominal capacity. It is located 9km to the east of the former Fachinal mine in a district with extensive exploration potential. According to the technical report published in March 2017 the operation has a life of mine of 3 years.

What's included

This report contains

  • Document

    Cerro Bayo (Fachinal) gold mine

    XLS 135.50 KB

  • Document

    Cerro Bayo (Fachinal) gold mine

    PDF 598.06 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Sales contracts
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898