Asset Report

Cerro Bayo (Fachinal) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The operation is comprised of an underground mine and a concentrator with a 1.65kt/d nominal capacity. It is located 9km to the east of the former Fachinal mine in a district with extensive exploration potential. As of September 2017, the mine was placed on care and maintenance following flooding in the Delia NW vein. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
    • Power
    • Water
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Cerro Bayo (Fachinal) gold mine

    XLS 125.50 KB

  • Document

    Cerro Bayo (Fachinal) gold mine

    PDF 1.14 MB

  • Document

    Cerro Bayo (Fachinal) gold mine

    ZIP 959.31 KB