Asset Report

Chelopech gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Copper concentrate from the Chelopech operation is treated at the Tsumeb Smelter in Namibia, which is one of the few smelters worldwide capable of treating high arsenic content concentrates. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Chelopech gold mine

    XLS 144.50 KB

  • Document

    Chelopech gold mine

    PDF 1.20 MB

  • Document

    Chelopech gold mine

    ZIP 1.04 MB