Asset report

Courageous Lake gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Courageous Lake property comprises 62 Federal Mining Leases and 26 Federal Mining Claims across 54km of greenstone belt with a total area of 33ha located 240km northeast of Yellowknife, in the North West territories.

What's included

This report contains

  • Document

    Courageous Lake Project gold mine

    XLS 127.00 KB

  • Document

    Courageous Lake gold mine project

    PDF 695.55 KB

Table of contents

  • Key facts
    • Summary
    • Open pit mining is planned over a 15 year mine life. Ore will be processed in a High Pressure Grinding Roll (HPGR), with ball mill grinding, flotation and pressure oxidation (POX) and a carbon-in-leach (CIL) leach circuit. Mill capacity is estimated at 6.4Mt/a producing 380koz/a over the life of mine.
    • Key issues
  • Location maps
  • Geology
  • Reserves and resources
    • Mining
    • Processing
  • Infrastructure
    • CAPEX
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898