Asset Report

Courageous Lake gold mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

29 March 2018

Courageous Lake gold mine project

Report summary

The Courageous Lake property comprises 62 Federal Mining Leases and 26 Federal Mining Claims across 54km of greenstone belt with a total area of 33ha located 240km northeast of Yellowknife, in the North West territories. Open pit mining is planned over a 15 year mine life. Ore will be processed in a High Pressure Grinding Roll (HPGR), with ball mill grinding, flotation and pressure oxidation (POX) and a carbon-in-leach (CIL) leach circuit. Mill capacity is estimated at 6.4Mt/a producing 380koz/a over the life of mine.

Table of contents

  • Key facts
    • Summary
    • Open pit mining is planned over a 15 year mine life. Ore will be processed in a High Pressure Grinding Roll (HPGR), with ball mill grinding, flotation and pressure oxidation (POX) and a carbon-in-leach (CIL) leach circuit. Mill capacity is estimated at 6.4Mt/a producing 380koz/a over the life of mine.
    • Key issues
  • Location maps
  • Geology
  • Reserves and resources
    • Mining
    • Processing
  • Infrastructure
    • CAPEX
  • Timeline

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1

What's included

This report contains:

  • Document

    Courageous Lake gold mine project

    XLS 127.00 KB

  • Document

    Courageous Lake gold mine project

    PDF 695.69 KB

Other reports you may be interested in

Browse reports by Industry Sector