Asset Report

Dahongshan copper mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Dahongshan is located in Yunnan Province in China. Construction started in 1984, but first reported production was in 1997 at a milling rate of 2kt/d. Subsequent investment in the plant has resulted in a current milling capacity of 14.5kt/d. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes 1 images and tables including:

What's included

This report contains:

  • Document

    Dahongshan copper mine

    PDF 1.25 MB

  • Document

    Dahongshan copper mine

    XLS 409.50 KB