Asset Report
Dingtai Tuoyuan alumina refinery
Report summary
Production was suspended in 2009. We have restart in 2014. We do not include Phase #2 in our base case. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Bauxite
- Digestion
- Calcining
-
Environmental
- Red Mud
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: