Asset Report

DongAn gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Eastern Dragon gold mine is located 45km southeast of the town of Xunke, which is adjacent to the Heilongjiang River which forms the border with Russia. Gold ore is mined initially via open pit method and subsequently via underground mining underneath the open pit. Trial production commenced in September 2017, and initial full production capacity of 450t/d was reached by December 2017. In 2019, refurbishment of the processing plant was underway to facilitate the production of 99.99% gold bar and silver bar products as opposed to a gold-silver dore.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process
  • CAPEX

Tables and charts

This report includes the following images and tables:

  • Detail map

What's included

This report contains:

  • Document

    Eastern Dragon gold mine project

    XLS 116.00 KB