Asset Report

El Arco gold minesite project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

El Arco gold minesite project

Report summary

In 2018 Grupo Mexico was anticipating an open pit mine and a conventional 110kt/a ore concentrator and a 35kt/a cathode plant. The SxEw plant will start first and one year later the concentrator. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Power
  • Water
  • CAPEX
  • Operating

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    El Arco Minesite Project gold mine

    XLS 119.00 KB

  • Document

    El Arco gold minesite project

    ZIP 1.03 MB

  • Document

    El Arco gold minesite project

    ZIP 1.02 MB

Trusted by leading organisations