Asset report

El Castillo gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

El Castillo is a conventional open pit operation utilising drill, blast, load and haul mining methods. Ore is crushed and heap leached and gold is recovered in a carbon-in-column (CIC) circuit. Operations are expected to continue until 2023 with the addition of the San Agustin extension deposit.

What's included

This report contains

  • Document

    El Castillo gold mine

    XLS 123.00 KB

  • Document

    El Castillo gold mine

    PDF 623.51 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Tilden iron ore mine

Asset report

United iron ore mine

Asset report

Minorca iron ore mine

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898