Eleonore is comprised of an underground mine and a processing plant. The initial mill throughput is 3.5kt/d with a budgeted final 7.5 kt/d by 2018. Mineralisation is host by stockwork veins contained within clastic sediments. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.