Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine
Report summary
ERGO is one of the largest tailings retreatment facilities in the world. Tailings/slimes are treated at a 22Mt/a facility in Brakpan. Average annual gold production is 145-162koz. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ergo - Daggafontein Tailing Treatment Plant (to 1996) (Closed) gold mine
A detailed analysis of the Ergo - Daggafontein Tailing Treatment Plant (to 1996) (Closed) gold mine.
$2,250
Asset Report
Crown Consol. (Rand Mines Dumps, Knights Gold, Cason Dump) (Closed) gold mine
A detailed analysis of the Crown Consol. (Rand Mines Dumps, Knights Gold, Cason Dump) gold mine.
$2,250
Asset Report
Durban Roodepoort Deep (including West Wits Section) (Closed) gold mine
A detailed analysis of the Durban Roodepoort Deep (including West Wits Section) (Closed) gold mine.
$2,250