Asset Report

Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

ERGO is one of the largest tailings retreatment facilities in the world. Tailings/slimes are treated at a 22Mt/a facility in Brakpan. Average annual gold production is 145-162koz. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine

    XLS 146.50 KB

  • Document

    Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine

    PDF 1.19 MB

  • Document

    Ergo Tailing Treatment Plant (Daggafontein, Crown & ERPM) gold mine

    ZIP 1.02 MB