Asset report

ERPM (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Restructuring in 2005 under black economic empowerment (BEE) requirements saw a newly created vehicle DRDGOLD SA; assume ownership of ERPM Crown Consolidated and Blyvooruitzicht. Khumo Bathong now holds a 20% interest in DRDGOLD SA with an additional 6% held in an employee trust. ERPM's underground operation was on a controlled closure programme with the exception of the FEV shaft area. Surface mining of the Cason Dump will continue but this is reported under Crown Consolidated following...

What's included

This report contains

  • Document

    ERPM (Closed) gold mine

    XLS 128.00 KB

  • Document

    ERPM (Closed) gold mine

    PDF 404.17 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898