Asset Report

ERPM Sand Treatment (Closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The 1.0Mt/a sand treatment plant, constructed at a cost of R7.5M, was commissioned in late 1987. The Angelo dump was worked out in 1999. Production now concentrates on the Cason dump with a reserve of 17Mt grading 0.7g/t. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    ERPM Sand Treatment (Closed) gold mine

    XLS 114.00 KB

  • Document

    ERPM Sand Treatment (Closed) gold mine

    PDF 1.18 MB

  • Document

    ERPM Sand Treatment (Closed) gold mine

    ZIP 1014.21 KB