Asset report

ERPM Sand Treatment (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The 1.0Mt/a sand treatment plant constructed at a cost of R7.5M was commissioned in late 1987. The Angelo dump was worked out in 1999. Production now concentrates on the Cason dump with a reserve of 17Mt grading 0.7g/t.

What's included

This report contains

  • Document

    ERPM Sand Treatment (Closed) gold mine

    XLS 122.00 KB

  • Document

    ERPM Sand Treatment (Closed) gold mine

    PDF 396.79 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Cooke gold mine

Asset report

DBM gold mine project

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898