Asset Report

Escondida gold minesite

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

03 September 2018

Escondida gold minesite

Report summary

The mine is currently (2018)  operating two open pits (Escondida and Escondida Norte) and since Q4 2017, after significant water  and power constraints were overcome,  Escondida could operate its three concentrators. For 2018 the total mill capacity was rated at 408kt/d ore (152kt/d ore for both Laguna Seca and OGP1 and 104kt/d ore for the Los Colorados). This provides Escondida with milling flexibility to offset the future declining quality of the ore. Copper concentrates also contain gold and silver in saleable quantities. These represented 6% in 2017 of the total concentrate revenue and 7% in 2016.

Table of contents

Tables and charts

This report includes 11 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Image 1
  • Costs: Table 2
  • Production: Table 1
  • Production: Image 1
  • Operations: Table 1

What's included

This report contains:

  • Document

    Escondida gold minesite

    PDF 1.01 MB

  • Document

    Escondida gold mine.xls

    XLS 381.50 KB