Asset report

Eureka (Zimbabwe) (Closed) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Capital expenditure of $25M was budgeted to bring the project into production. A comprehensive environmental management plan was adopted complying with local and international standards. The plan includes continual rehabilitation and re vegetation of the site.

What's included

This report contains

  • Document

    Eureka (Zimbabwe) (Closed) gold mine

    XLS 117.50 KB

  • Document

    Eureka (Zimbabwe) (Closed) gold mine

    PDF 697.25 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898