Asset report

Falcondo nickel operation

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Falcondo has had to face two major challenges to ensure profitable operation. The first concerns its reliance upon crude oil, and the price shocks of 1973 and 1979 forced the company to reduce oil consumption as well as to find a way of adapting the raw material used. From 1971-1981 a reconstituted crude consisting of naptha and bottoms was used but, in the early 1980s, a higher efficiency crude tower was installed to enable a sharp split of distillate and bottoms to be produced from a...

What's included

This report contains

  • Document

    BnoNi.xls

    XLS 740.00 KB

  • Document

    Falcondo - closed nickel operation flowsheet

    PDF 19.74 KB

  • Document

    Falcondo nickel operation

    PDF 317.41 KB

  • Document

    BphNi.xls

    XLS 486.50 KB

Table of contents

  • Key facts
  • Summary and key issues
    • Detailed map
  • Participation
  • Geology
  • Reserves and resources
    • Mining
    • Process
  • Production
  • Costs
  • Timeline

Tables and charts

This report includes 8 images and tables including:

Images

  • Production: Image 1
  • Costs: Image 1
  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Cashflow

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898