Asset Report
Ganhe zinc smelter
Report summary
The Ganhe smelter was commissioned in 2007 with a capacity of 60kt/a. The plant included one 80m2 roaster with 110kt/a double contact acid plant, Chinese tankhouse and leach residue processing by Waelz kiln. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Other
Tables and charts
This report includes 7 images and tables including:
- Detailed map
- Ganhe Electrolytic Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains:
Other reports you may be interested in
Asset Report
Valleyfield zinc smelter
A detailed analysis of the Valleyfield zinc smelter.
$2,250
Asset Report
Tak zinc smelter
A detailed analysis of the Tak zinc smelter.
$2,250
Asset Report
Hindustan Zinc (Pre-2005) (Closed) zinc mine
A detailed analysis of the Hindustan Zinc (Pre-2005) zinc mine.
$2,250