Asset report

Glogow I copper refinery

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Glogow I refinery was commissioned as a state enterprise in 1971 to treat anodes from the Glogow I smelter commissioned at the same time and was expanded to a capacity of 190kt/a cathode in 1974. It is located at Glogow approximately 100km south west of Poznan. In the early 1990's approximately 30kt/a cathode from the refinery was converted into wirebar in an onsite plant. The wirebar plant was closed down in early 1994. Currently approximately 85kt/a cathode is converted to rod in...

What's included

This report contains

  • Document

    Glogow I copper refinery

    PDF 665.84 KB

  • Document

    Glogow I copper refinery.xls

    XLS 694.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 9 images and tables including:

Images

  • Detailed map
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898