Asset report

Glogow I copper refinery

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Glogow I refinery was commissioned as a state enterprise in 1971 to treat anodes from the Glogow I smelter commissioned at the same time, and was expanded to a capacity of 190kt/a cathode in 1974. It is located at Glogow, approximately 100km south-west of Poznan. In the early 1990's approximately 30kt/a cathode from the refinery was converted into wirebar in an onsite plant. The wirebar plant was closed down in early 1994. Currently, approximately 85kt/a cathode is converted to rod in...

What's included

This report contains

  • Document

    Glogow I copper refinery

    PDF 665.84 KB

  • Document

    Glogow I copper refinery.xls

    XLS 694.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 9 images and tables including:

Images

  • Detailed map
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898