Asset Report

Guelb Moghrein gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Guelb Moghrein is an open pit copper-gold mine which produces copper-gold concentrate. The deposit was previously mined from 1967 to 1978 and then again from 1992 to 1996 when gold was recovered from the copper tailings. The attached analysis assumes operations continue through to 2025. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • CAPEX
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Guelb Moghrein gold mine

    XLS 125.00 KB

  • Document

    Guelb Moghrein gold mine

    PDF 1.09 MB

  • Document

    Guelb Moghrein gold mine

    ZIP 925.45 KB