Asset report

Halilaga gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Halilaga project is a low-grade greenfield copper-gold porphyry deposit. The accompanying analysis is based on an updated Preliminary Economic Assessment, study whose results were published in Q1, 2015. The study envisages a 14 year operation with an average mill throughput rate of 25kt/a. Mining will be by conventional open pit methods with an assumed life-of-mine stripping ratio of 1.3:1. The ore will be treated in a typical differential flotation plant producing a gold-copper concentrate.Payable copper and gold production over the 14 year mine life is expected to be 780Mlb Cu and 925koz of Au.

What's included

This report contains

  • Document

    Halilaga Project gold mine

    XLS 128.00 KB

  • Document

    Halilaga gold mine project

    PDF 1.01 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898