Asset Report

Halilaga gold mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

26 May 2017

Halilaga gold mine project

Report summary

The Halilaga project is a low-grade greenfield copper-gold porphyry deposit. The accompanying analysis is based on an updated Preliminary Economic Assessment, study whose results were published in Q1, 2015. The study envisages a 14 year operation with an average mill throughput rate of 25kt/a. Mining will be by conventional open pit methods with an assumed life-of-mine stripping ratio of 1.3:1. The ore will be treated in a typical differential flotation plant producing a gold-copper concentrate. Payable copper and gold production over the 14 year mine life is expected to be 780Mlb Cu and 925koz of Au.

Table of contents

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Detailed map

What's included

This report contains:

  • Document

    Halilaga Project gold mine

    XLS 128.00 KB

  • Document

    Halilaga gold mine project

    PDF 1.01 MB

Other reports you may be interested in

Browse reports by Industry Sector