Asset report

Harmony Phoenix gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

  • An error has occurred while getting captcha image

Report summary

The operation involves the re-treatment of tailings at the Saaisplant plant which was converted in 2007 to treat slimes/tailings. The annual throughput capacity is 6Mt. In 2017 the operation is expected to produce around 30koz from the re-treatment of 6.5Mt of material.

What's included

This report contains

  • Document

    Harmony Phoenix gold mine

    XLS 118.50 KB

  • Document

    Harmony Phoenix gold mine

    PDF 350.68 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:


  • Location maps: Image 1


  • Key facts: Table 1

You may be interested in


Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898