Asset report

Huangmu zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Lanping ore deposit was discovered in the 1970s and was initially exploited by a number of small mines and smelters one of the latter was Huangmu. By 2003 the Huangmu smelter had fallen within the ownership of Yunnan Jinding where it was called the No1 smelter Lanping is No2. At the end of 2011 it was decided to close the Huangmu smelter in 2012 and concentrate all operations at the larger Lanping smelter.

What's included

This report contains

  • Document

    Huangmu (Electrolytic) closed zinc smelter

    XLS 256.50 KB

  • Document

    Huangmu zinc smelter

    PDF 631.87 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898