Asset Report
Idol (Clinch Valley) Closed zinc mine
Report summary
The mine closed in 2004. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
10 December 2019
Hellyer Mine Restart (Closed) zinc mine
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,25015 February 2021
Mae Sod (closed) zinc mine
Asset Report
Mae Sod (closed) zinc mine
A detailed analysis along the production and commercialisation chain of the Mae Sod zinc mine.
$2,25012 February 2021
Coricancha (Closed) zinc mine
Asset Report
Coricancha (Closed) zinc mine
A detailed analysis of the Coricancha zinc mine.
$2,250