Asset report

Izok Lake zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The project area is extremely remote and lies within the Arctic and Sub Arctic zones. Development will face considerable operational and environmental challenges. However the deposit has the advantage of being backed by MMG Ltd which is 75% owned by the Chinese Government. The other positive point is that the deposit is the most likely candidate to replace production from the MMG Ltd owned Century mine which closed in 2016.

What's included

This report contains

  • Document

    Izok Lake Project zinc mine

    XLS 517.50 KB

  • Document

    Izok Lake zinc mine project

    PDF 679.91 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Infrastructure
  • Costs
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898