Asset Report
Kansanshi copper smelter
Report summary
The smelter started operating in February 2015 and its capacity is 300kt/a anodes. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
05 August 2021
Kansanshi copper mine
Asset Report
Kansanshi copper mine
A detailed analysis of the Kansanshi copper mine.
$2,25011 November 2021
Henan Yuguang copper smelter
Asset Report
Henan Yuguang copper smelter
A detailed analysis of the Henan Yuguang copper smelter.
$2,25012 May 2021
Ventanas copper smelter
Asset Report
Ventanas copper smelter
A detailed analysis of the Ventanas copper smelter.
$2,250