The mine site is located 200km inland in the East Kalimantan province, and is only accessible by a 500km boat journey up the Mahakam river followed by 52km by road to the mine, or by helicopter. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.