Asset Report

Kiaka gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Kiaka will be a open pit operation utilising conventional drill, blast and haul mining methods over a 10-year mine life. The process plant will comprise single stage crushing, semi-autogenous (SAG) and ball mill grinding and a carbon-in-pulp (CIP) circuit with a capacity of 12Mt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Kiaka gold mine project.xls

    XLS 118.50 KB

  • Document

    Kiaka gold mine project

    PDF 1.13 MB

  • Document

    Kiaka gold mine project

    ZIP 931.53 KB