Kiaka will be a open pit operation utilising conventional drill, blast and haul mining methods over a 10-year mine life. The process plant will comprise single stage crushing, semi-autogenous (SAG) and ball mill grinding and a carbon-in-pulp (CIP) circuit with a capacity of 12Mt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Yellowknife gold mine project
A detailed analysis of the Yellowknife gold mine project.
$2,250
Asset Report
Cameron gold mine project
A detailed analysis of the Cameron gold mine project.
$2,250