Asset Report

Kirazli gold mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

Kirazli gold mine project

Report summary

Kirazli is one of two projects being advanced by Alamos Gold in Turkey. The other one being Agi Dagi. A feasibility study on Kirazli was completed in 2017 and this was based on a five-year operation producing an annual average of 104koz of gold. First production is expected in 2020. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Kirazli gold mine project

    XLS 112.50 KB

  • Document

    Kirazli gold mine project

    PDF 1.01 MB

  • Document

    Kirazli gold mine project

    ZIP 990.04 KB

Trusted by leading organisations