Asset report

Kirazli gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Kirazli is one of two projects being advanced by Alamos Gold in Turkey. The other one being Agi Dagi. A feasibility study on Kirazli was completed in 2017 and this was based on a five year operation producing an annual average of 104koz of gold. First production is expected in 2019.

What's included

This report contains

  • Document

    Kirazli gold mine project

    XLS 111.50 KB

  • Document

    Kirazli gold mine project

    PDF 1017.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Production
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898