Report summary
It was announced by Urals Mining & Metallurgical Co (UMMC) in early 2006 that it would be building a new zinc smelter in the Sverdlov region of Russia, the actual location likely to be at Kirovgrad. The capacity was planned to be 150kt/a slab zinc and the estimated capital cost, US$325M. Detailed design, using Outokumpu technology, would take place in 2007, with a focus on copper and precious metals by-products since the smelter was expected to take an anticipated increasing surplus of...
Table of contents
- Conc. Receipt / Storage
- Roaster
- Acid Plant
- Leach Plant
- Purification
- Tankhouse
- Casting Plant
- Residue Disposal
- Other
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Huili zinc smelter project
A detailed analysis of the Huili zinc smelter project.
$2,250
Asset Report
Cartagena (Escombreras) zinc smelter project
A detailed analysis of the Cartagena (Escombreras) zinc smelter project.
$2,250
Asset Report
Nueva Rosita zinc smelter project
A detailed analysis of the Nueva Rosita zinc smelter project.
$2,250