Asset report

Kirovgrad zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

It was announced by Urals Mining & Metallurgical Co (UMMC) in early 2006 that it would be building a new zinc smelter in the Sverdlov region of Russia, the actual location likely to be at Kirovgrad. The capacity was planned to be 150kt/a slab zinc and the estimated capital cost, US$325M. Detailed design, using Outokumpu technology, would take place in 2007, with a focus on copper and precious metals by-products since the smelter was expected to take an anticipated increasing surplus of...

What's included

This report contains

  • Document

    Kirovgrad zinc smelter project

    PDF 818.17 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898