Asset report

Kirovgrad zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

It was announced by Urals Mining & Metallurgical Co (UMMC) in early 2006 that it would be building a new zinc smelter in the Sverdlov region of Russia the actual location likely to be at Kirovgrad. The capacity was planned to be 150kt/a slab zinc and the estimated capital cost US$325M. Detailed design using Outokumpu technology would take place in 2007 with a focus on copper and precious metals by products since the smelter was expected to take an anticipated increasing surplus of...

What's included

This report contains

  • Document

    Kirovgrad zinc smelter project

    PDF 818.17 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898