Asset Report

La Cienega gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

This is a gold, silver, lead, zinc underground mine with flotation and leaching facilities. The current capacity of the mill is 3.6kt/d. Total capex at start-up was estimated at US$70 million. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • CAPEX
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    La Cienega gold mine

    XLS 149.50 KB

  • Document

    La Cienega gold mine

    PDF 1.20 MB

  • Document

    La Cienega gold mine

    ZIP 1.03 MB