Asset Report
Lagunas Norte (Alto Chicama) gold mine
Report summary
The mine is a typical open pit, valley-fill heap leaching operation with gold and silver recovered via a Merrill Crowe circuit. In Q3 2018, Barrick updated the feasibility study pertaining to the processing of carbonaceous material and the treatment of refractory sulphide ore. Based on the conclusions of the report Barrick deemed that the project did not meet their investment criteria and that they would no longer proceed with the project until the economics were more favourable. Subsequently we have removed this project from the accompanying analysis. In Q3 2019, Barrick made the decision to place Lagunas Norte on care and maintenance.
Table of contents
- Summary
- Key issues
- Mining
- Royalty Streams
- CAPEX
- Royalties and taxes
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Soto Norte (La Bodega) gold mine project
A detailed analysis of the Soto Norte gold mine project.
$2,250
Asset Report
Las Lagunas (Closed) gold mine
A detailed analysis of the Las Lagunas gold mine.
$2,250