Asset report

Lagunas Norte (Alto Chicama) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The mine is a typical open pit heap leaching operation with gold recovered via a Merrill Crowe circuit. In 2015 a Pre Feasibility Study was completed for a Mine Life Extension (MLE) Project. The MLE project is based on the mining of sulphide mineralisation beneath the existing oxide orebody and processing of refractory ore (currently being stockpiled) with potential to extend mine life by 9 years commencing in 2021. Open pit mining and Heap Leach operations are expected to cease in 2023 as production from stockpiled refractory ore commences.

What's included

This report contains

  • Document

    Lagunas Norte (Alto Chicama) gold mine

    XLS 132.50 KB

  • Document

    Lagunas Norte (Alto Chicama) gold mine

    PDF 497.68 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Sales contracts
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898