Asset report

Livengood gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Livengood is expected to be developed as an open pit mine utilising gravity concentration and gold recovery in carbon in leach plant for an initial capital cost of US$3 billion. Average annual gold production over 13 years is 562koz.

What's included

This report contains

  • Document

    Livengood Project gold mine

    XLS 131.00 KB

  • Document

    Livengood gold mine project

    PDF 867.64 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898