Asset Report

Marlin (closed) gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The open pit was depleted in 2012 and production since then has been from underground operations. The mine was placed on closure in May 2017 due to reserve depletion. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Marlin gold mine

    XLS 117.50 KB

  • Document

    Marlin (closed) gold mine

    PDF 1.20 MB

  • Document

    Marlin (closed) gold mine

    ZIP 1002.95 KB