Asset report

Metates gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an open pit crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry autoclave facility leaching facility Merrill Crowe plant acid neutralisation tank SX/EW plant. The estimated mine life is 17 years excluding pre stripping but the plan is to operate for an additional 10 years by treating stockpile ores.The Metates Plant will produce a sulphide bulk concentrate then transported to El Paso Plant to produce zinc ingot silver and gold dore.

What's included

This report contains

  • Document

    Metates gold mine project

    XLS 133.00 KB

  • Document

    Metates gold mine project

    PDF 816.64 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Infrastructure
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898