Asset Report

Metates gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an open pit, crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry, autoclave facility, leaching facility, Merrill-Crowe plant, acid neutralisation tank, SX/EW plant. The estimated mine life is 17 years excluding pre-stripping but the plan is to operate for an additional 10 years by treating stockpile ores. The Metates Plant will produce a sulphide bulk concentrate, then transported to El Paso Plant to produce zinc ingot, silver and gold dore.

Table of contents

  • Summary
  • Key Issues
  • CAPEX
  • Mining
  • Process
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Location map

What's included

This report contains:

  • Document

    Metates gold mine project

    XLS 119.50 KB

  • Document

    Metates gold mine project

    PDF 1.19 MB

  • Document

    Metates gold mine project

    ZIP 1.04 MB