Asset Report

Mikkaichi (Electrothermic) zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The zinc smelter at Mikkaichi in Japan used the electrothermic process to produce slab zinc. However producing zinc by this process proved uneconomic and the smelter closed as a primary zinc smelter in 1995. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes 8 images and tables including:

  • Detailed map
  • Feed Preparation
  • Roaster and Acid Plant
  • Sinter Plant
  • Smelting
  • Refining
  • Casting

What's included

This report contains:

  • Document

    Mikkaichi (Electrothermic) zinc smelter

    PDF 1.20 MB

  • Document

    Mikkaichi (Electrothermic) zinc smelter

    ZIP 1.10 MB