Asset Report
Minto copper mine
Report summary
Road access to and from Minto mine is affected by the freezing and thawing of the Yukon River, which takes place over eight to ten weeks beginning in April and October. During these periods, the mine site can accommodate up to 20,000dmt of copper concentrate in storage. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- CAPEX
- Royalty streams
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mt Garnet (Copper Plant) copper mine
A detailed analysis of the Mt Garnet (Copper Plant) copper mine.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250
Asset Report
Palabora copper mine
A detailed analysis of the Palabora copper mine.
$2,250