Asset Report

Mt Todd gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Mt Todd project, previously known as Yimuyn Manjerr, involves large scale open pit mining. The projects Preliminary Feasibility Study considers a base case and an alternate scenario. The base case scenario (on which this analysis is based) provides a longer mine life and larger NPV at an ore processing rate of 50kt/d while the alternate scenario provides a shorter mine life, processing higher grade ore at a rate of 33kt/d. The operation is projected to produce over 400koz Au per year on average over an initial 13 year mine life. The property comprises the previously mined Batman and Quigleys deposits, located 290km southeast of Darwin in Northern Territory, Australia.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Mt Todd (Yimuyn Manjerr) gold mine

    XLS 124.00 KB

  • Document

    Mt Todd gold mine

    PDF 1.04 MB

  • Document

    Yimuyn Manjerr (Mt Todd) gold mine

    ZIP 917.11 KB