Navigating the copper project minefield: the remaining four risks

Get this report*

$1,050

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

In our first edition, we examined water availability and biodiversity, two environmental risk categories that together expose material volumes of the global copper project pipeline. In this edition, we complete the framework by addressing the remaining four: permitting, technical, funding, and social/political risks. We have also upgraded our methodology. The first edition used a binary flag, we identified a project either exposed to a risk or it was not. This edition introduces a tiered severity system, ranging from low to very high, replacing the binary instrument with a calibrated scale that reflects the true spectrum of risk intensity across our database of more than 300 projects.

Table of contents

  • Executive summary
  • Permitting risks
  • Technical risks
  • Funding risks
  • Social and political risks
  • The compounding problem

Tables and charts

This report includes the following images and tables:

    Identified future production facing multi-tiered risksIdentified production facing high to very high permitting risksIdentified production facing relatively high technical risksIdentified production facing high to very high funding risksIdentified production facing high to very high socio-political risks

What's included

This report contains:

  • Document

    Global Copper Project Risk Analysis.xlsx

    XLSX 28.08 KB

  • Document

    Navigating the copper project minefield: the remaining four risks

    PDF 999.28 KB