Asset Report
New Bendigo (Closed) gold mine
Report summary
Owing to reserve depletion the operation was placed on care and maintenance in June 2011. There is an ongoing exploration programme to identify further resources but Unity is also exploring the viability of selling the 660kt/a processing plant. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Reedy (Closed) gold mine
A detailed analysis of the Reedy (Closed) gold mine.
$2,250
Asset Report
Similco (Closed) gold mine
A detailed analysis of the Similco (Closed) gold mine.
$2,250
Asset Report
Norseman (AGM) (Closed) gold mine
A detailed analysis of the Norseman (AGM) (Closed) gold mine.
$2,250