Asset report

Norilsk gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Mining in Norilsk began with an open pit at Medvezhy Ruchei during the 1930s and was followed by underground operations at Zapolyarny in 1945. These two deposits form the Norilsk 1 mining area. Given their age and poor base metal values the mines were going to close by 2001 2002 under the 1996 reorganisation plan. However under the production plan formulated during 1998 1999 and approved by the Board in 2000 their relatively high PGM content has assured their continuation until until the present day. In 2015 Norilsk commissioned the first stage of the Talnakh mill upgrade. The total investment was RUB3 billion and included the installation of new flotation cells automated pumps and updating of power lines. The second stage of the upgrade which will raise milling capacity by 2.5Mt/a to 10.2Mt/a from the present 7.7Mt/a is scheduled to occur in 2016.

What's included

This report contains

  • Document

    Norilsk gold mine

    XLS 152.50 KB

  • Document

    Norilsk gold mine

    PDF 624.97 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898