Asset Report
Nugget Pond (including Hammerdown) (Closed) gold mine
Report summary
The mine closed in May 2004 and the site has been rehabilitated. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Dona Lake (Closed) gold mine
A detailed analysis of the Dona Lake (Closed) gold mine.
$2,250
Asset Report
Sibutad (Closed) gold mine
A detailed analysis of the Sibutad (Closed) gold mine.
$2,250
Asset Report
Lac Shortt (Closed) gold mine
A detailed analysis of the Lac Shortt (Closed) gold mine.
$2,250