Asset Report
Odysseus - nickel project
Report summary
In August 2018 Western Areas announced that it will release a definitive feasibility study (DFS) on the Odysseus project in September. As mining transitions from open pit to underground the company is looking at designing a shaft haulage system that will have a life of greater than 10 years and allow average nickel production of 12.5 kt/a and up to 17 kt/a during its peak. The operation will also require a larger 900 kt/a mill to be constructed. Odysseus is expected to start production of ore in late 2021 with first nickel concentrate to follow in late 2022.
Table of contents
- Emissions
- Mining
- Process
- Cashflow
Tables and charts
This report includes 9 images and tables including:
- Odysseus Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Araguaia nickel project
A detailed analysis of the Araguaia nickel project.
$2,250
Asset Report
Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project
A detailed analysis of the Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project.
$2,250
Asset Report
Fisher East nickel project
A detailed cost analysis of the Fisher East nickel project.
$2,250