Pedra de Ferro iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
Tables and charts
This report includes the following images and tables:
-
Detail MapParticipationMarketable reserves (at 01/01/2026)
-
ProductionProductionOperationsInfrastructureCash cost (US$/tonne)Cash costCapital costs (US$ million)Product qualityEconomic assumptions
What's included
This report contains:
Other reports you may be interested in
Sishen iron ore mine
Sishen's ultra-high dense media separation (UHDMS) plant will extend mine life to 2040, lower the strip ratio and improve product quality.
$2,250Kolomela iron ore mine
Kolomela's production in 2023 is expected to increase on account of better availability of logistics.
$2,250Nickel Pig Iron RKEF nickel operation
A detailed analysis of the Nickel Pig Iron RKEF nickel operation.
$2,250