Asset Report
Pubei (Closed) zinc mine
Report summary
Mining capacity is ~45kt/a and milling capacity is rated at ~245kt/a ore. To maximise utilisation of the mill, additional ore is sourced from other small scale mines in the area. Mill utilisation rates are low at around 50%. The mill is expected to close on exhaustion of the Pubei resource in 2013. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Brunswick (Closed) zinc mine
A detailed analysis of the Brunswick zinc mine.
$2,250
Asset Report
Duck Pond (closed) zinc mine
A detailed analysis of the Duck Pond zinc mine.
$2,250
Asset Report
Iscaycruz (Closed) zinc mine
A detailed production, commercial and competitive analysis of the Iscaycruz zinc mine.
$2,250