Asset Report

Qujing zinc smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Qujing zinc smelter was a greenfield 100kt/a capacity smelter that formed part of a large new investment by Yunnan Chihong that included the expansion of the Huize mine. The total cost of the new zinc smelter was US$96M and commissioning took place in July 2005, with the official opening in December. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Residue Disposal
  • Other

Tables and charts

This report includes 8 images and tables including:

  • Qujing Emission Intensity Quartile Ranking - total global production - tonnes Zn
  • Detailed map
  • Flowsheet
  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting
  • Products

What's included

This report contains:

  • Document

    Qujing zinc smelter

    PDF 1.74 MB

  • Document

    Qujing zinc smelter

    ZIP 1.18 MB