Asset report

Reed copper mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In December 2011 the Hudbay Board of Directors approved the construction of the Reed mine project. First production commenced in September 2013 with commercial production following on April 1 2014. Reed ore is treated at HudBay's Flin Flon Concentrator which is capable of producing both copper and zinc concentrates. However due to the low Reed Lake zinc grade only a copper concentrate with silver and gold credits is produced.

What's included

This report contains

  • Document

    Reed copper mine.xls

    XLS 494.00 KB

  • Document

    Reed copper mine

    PDF 651.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Costs
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898